Skip to content
RENCOMENA

Lake Worth, Florida, USA

Lakewood Village

Four three-storey residential buildings in a Florida hurricane zone. The first RENCO project in the United States.

Partners: Coastal Construction and Dezer Development

to erect and assemble all four buildings
on the crew, none with conventional construction training
saved on duration and cost against hurricane-zone concrete
the weight of an equivalent concrete structure

Source: RENCO USA project records.

From delivery to handover

Pallets of blocks arrive on site, crews assemble the walls by hand, upper floors go up, and the finished apartments are handed over. The video has no sound.

How the complex was built

  1. 1
    Aerial view of ground-floor wall layouts on their slabs.

    Plan

    Floor plans were converted into colour-coded block layouts, so every wall could be assembled from the drawing.

  2. 2
    Ground-floor walls being assembled across several slabs.

    Ground-floor walls

    Crews pressed the interlocking blocks together and bonded each course with adhesive. No cutting and no heavy machinery on the slab.

  3. 3
    Three-storey buildings with upper floors under construction.

    Upper floors

    The same block-and-adhesive method continued up to the second and third storeys.

  4. 4
    The completed Lakewood Village buildings with coloured balconies.

    Handover

    All four buildings were erected and assembled in under eight weeks, by a crew of 11.

Photos

What partners said

“As a partner in the first demonstration project to utilize RENCO's materials, we have seen firsthand just how revolutionary these products are.”

Gil Dezer, Dezer Development

“Like every architect, we were suspicious but concerns quickly fell away. It was like dealing with any other system except it was more suitable, easy to learn, and faster to build.”

Bernardo Fort-Brescia, Arquitectonica

Plan a building like this

Try the wall planner to see how a wall breaks down into blocks, or send us your project.